For those that have not seen the progress of the Las Vegas Stadium the future home of the Raiders.

As of 11/08/2018 the steel structure has been going up at a very good clip.
The second mezzanine is almost complete with about 4 to 8 pours left on the south end of the stadium where the field tray goes in and out. The north end is taking shape with the hole for the Al Davis memorial flame is located and also you can start to see how massive the opening for the doors will be. The first 4 elevator/stairwells are almost complete 4 more to go.

There is a lot of work going unseen in the lower level of the stadium out of the sight of the cameras. Electricians and Pipe Fitters are work in that area.